9.3 · Swimlanes, Bottlenecks, As-is & To-beConcept 08/11
Source: P3 · p. 41Bottleneck and seven Lean wastes
Bottleneck & 7 Lean Wastes
Understand
· Giải thích khái niệmThe lowest-capacity step determines process throughput. Signs: queues, long waits, overtime in one team, concentrated complaints. Improving a non-bottleneck has little effect. Seven wastes in the slide: waiting, duplicate entry, unnecessary movement, over-processing, errors/rework, excess inventory/backlogs and unused human capability.
VIBottleneck năng lực thấp nhất quyết tốc độ; dấu hiệu queue, chờ lâu, overtime một nhóm, khiếu nại tập trung. Cải tiến bước không nghẽn ít hiệu quả. 7 waste theo slide: waiting; duplicate entry; unnecessary movement; over-processing; errors/rework; excess inventory/backlogs; unused human capability.